Urban Expansion and Waste Woes: Pune’s Moshi Garbage Depot Struggles to Cope

The escalating challenge of managing garbage in Pune has intensified as the Moshi garbage depot nears its maximum capacity. The pressing issue has gained prominence due to the amalgamation of population growth and rapid urbanization. Situated in Pimpri-Chinchwad, an industrial hub that has evolved into a favored residential destination, the city’s population, which now stands at three million, is grappling with a mounting garbage crisis.

In 2017, the daily waste output of the city was measured at 832 tonnes. However, this figure has surged to a staggering 1,250 tonnes in recent times. The long-standing practice of collecting and depositing household waste at the Moshi garbage depot, spanning an expansive 81 acres, has encountered a predicament. The once spacious expanse is now constrained by burgeoning heaps of refuse, signaling a looming crisis.

The predicament has posed a formidable challenge for the Pimpri Chinchwad Municipal Corporation (PCMC), which is striving to secure suitable land for a new waste depot. Without a sustainable resolution in sight, the city’s garbage issue could spiral into a more dire concern as time progresses.

Recognizing the urgency of the situation, the forest department has proactively taken up the mantle to identify an alternate location for the garbage depot. This designated space, once identified, will then be seamlessly handed over to the municipal corporation for swift and sustainable waste management measures.

The need for innovative solutions to tackle the mounting waste problem has never been more critical. Pune’s authorities must collaborate and strategize to ensure that the city’s waste disposal infrastructure is equipped to handle the burgeoning demands of a growing population. As the forest department diligently works towards locating an appropriate site, there remains hope that Pune will soon overcome this challenge and pave the way for a cleaner, more sustainable future.

Share this article
0
Share
Shareable URL
Prev Post

Empowering Customers: MahaRERA Calls on Pune Builders to Set Up Complaint Resolution Cells

Next Post

Dry Spell Grips Maharashtra: No Rain Predicted for Next 5 Days, Water Reserves Adequate but Concerns Arise

Read next
Whatsapp Join