Navi Mumbai Metro Line 1 to Commence Operations on Nov 17, Ending a 12-Year Wait

Mumbai’s neighboring city, Navi Mumbai, is set to embrace the transformative era of Metro Rail, putting an end to a prolonged wait of over 12 years. The inaugural train service on Navi Mumbai Metro Line 1 will commence its journey from Belapur to Pendhar on November 17, marking a significant milestone in the city’s transportation landscape. Notably, the commencement will be a low-key affair without an official inauguration program.

Long-Awaited Inauguration: Navi Mumbai Metro Line 1 Takes Center Stage

The impetus for the immediate launch came from the directive of Chief Minister Eknath Shinde, urging CIDCO to make the Navi Mumbai Metro operational for the public’s convenience. Despite being ready for several months, the official inauguration was bypassed to expedite the commencement of regular services.

Operational Details: Regular Services and Ticket Rates

Starting November 17, regular services on the entire Navi Mumbai Metro Line 1 route will kick off, operating from 6 am to 10 pm with a frequency of 15 minutes between trains. This development is poised to significantly enhance the connectivity and accessibility for residents of Navi Mumbai.

Affordable Commuting: Ticket Rates and Comfortable Coaches

Commuters can avail themselves of the air-conditioned, comfortable coaches equipped with state-of-the-art facilities, offering a seamless and enjoyable travel experience. The ticket rates will vary based on the distance traveled, ranging from Rs 10 to Rs 40, ensuring affordability for a wide range of passengers.

Navi Mumbai Embraces Metro Connectivity: A New Chapter Begins

The introduction of Metro Line 1 in Navi Mumbai represents a crucial step forward in addressing the city’s growing transportation needs. The 12-year wait comes to an end, and Navi Mumbai residents can now benefit from a modern and efficient metro network.

Share this article
0
Share
Shareable URL
Prev Post

Connecting Hinjawadi to Shivajinagar: Pune Metro Line 3 Enters Rail Testing Phase

Next Post

Disrupted Serenity: Kalyani Nagar Residents Urge Action on Flour Works’ Late-Night Noise

Read next
Whatsapp Join